[google-translator]

Mak Ban 6

Turnkey Upgrade and Rehabilitation of old SPX Marley Crossflow cooling tower

Project: Mak Ban 6

Tower Type: 6-Cell, Crossflow, Wood.

Location: Luzon, Philippines

Year: 2008

Major repair project of a dilapidated 6-cell crossflow wood cooling tower. Aboitiz Power hired ICS to help Aboitiz rehabilitate an an old SPX Marley crossflow tower to peak performance and make it reliable again. The project was made much more difficult by the advanced state of decay of the wood, necessitating ICS and our local partner to have stringent safety protocols to ensure a Zero incident project. Starting from the top, ICS replaced most of the fan and hot water decks and the joists deck joists, the fans were rebuilt, gearboxes and driveshafts as well. Fill was replaced as needed and rehung as practical as were the drift eliminators. – total turnkey engineering, supply and construction by ICS.

Have an old dilapidated tower or just an under performing cooling tower in need of specialized attention and care? ICS can help you analyze, pre-plan and budget your work and take the project from planning to successful completion. Contact ICS now to ask how we can help you upgrade your plant performance.
Contact Us