[google-translator]

ICS Announces Comprehensive Cooling Technology Seminar in Thailand

Learn everything you need to knThai Posterow about cooling towers and air coolers in one day! Attend expert-led sessions and participate in panel discussions on a wide range of topics designed to help owners optimize for maximum efficiency & high availability operations.
Seminar topics will cover advanced level design, operation and technologies of cooling towers and air coolers. Participants include owners/operators and EPC Design firms including ICS, ICST, GE Water, Hudson Products, Brentwood Industries, Fuji Electric, Amarillo Gears.
The seminar, hosted by ICS Performance Alliance, will take place at the Kantary Bay Hotel from 8: 30 to 5:30 on March 10th, 2016.
Contact:
INTERNATIONAL COOLING SOLUTIONS (THAILAND) CO., LTD.
159 Serm-Mit Tower 9th Floor, Sukhumvit 21, Asoke Road
North Klongtoey, Wattana, Bangkok 10110, Thailand
Tel. +66 (0)2260-6598 Fax. +66 (0)2260-6599

Read More

ICS Awarded Multimillion Dollar Contract For 28-Cell Cooling Tower At New Petronas Refinery In Malaysia

Colorado-Based ICS Wins Major Cooling Tower Project in Malaysia
Multimillion dollar 28-cell cooling tower part of $16 billion Malaysian refinery complex

Lakewood, Colo., June 15, 2015 – Lakewood, Colorado-based Industrial Cooling Solutions (ICS) announced that it has been awarded a contract to build a multimillion dollar 28-cell cooling tower at the RAPID Steam Cracker Complex Project in Johor, Malaysia. ICS was awarded the contract by Japan-based Toyo Engineering Corporation (TEC) and its consortium partner, Thailand-based TTCL Public Company Limited (TTCL). The Cracker Complex is a part of the massive $16 billion RAPID petrochemical complex being built by the Malaysian state-owned energy company, Petronas.
Tim Bozic, President of ICS, said, “The fact that TEC and TTCL selected us for this landmark project, with the contract ratified by Petronas, is a testament to our record of global engineering excellence in complex cooling tower design and supply projects. We at ICS are thrilled and honored to have been recognized in this manner.”
ICS has successfully completed cooling tower projects for TTCL and TEC in multiple countries and this multimillion dollar award represents the company’s largest single-site cooling tower to date. The concrete, back-to-back counterflow cooling tower will play a critical role in the development of the state-of-the-art RAPID refinery by reducing power use while maintaining optimum plant efficiency for maximum production output.
The RAPID integrated refinery and petrochemical complex is currently scheduled to begin operating in 2019 and will add capacity to allow Petronas to better meet strong demand for refined petroleum.
About Industrial Cooling Solutions, Inc.
Industrial Cooling Solutions, Inc. (ICS) utilizes cutting-edge technology to provide turnkey water cooling management solutions nationally and internationally. The company’s products and services include the installation, repair and upgrade of custom-designed water cooling towers, as well as the provision of water treatment and filtration supplies and a full spectrum of cooling tower parts. ICS’s international headquarters are located in Lakewood, Colorado, while the company serves its global network through offices in Thailand, Japan, and Saudi Arabia. For more information please go to http://h2ocooling.com/ or contact ICS at 303-462-2000.

# # #

Read More

ICS to Exhibit at GEA Geothermal Energy Expo 2013

ICS exhibited at the 2013 global GEA Geothermal Energy Expo. We are proud to be a part of the geothermal energy community and enjoyed meeting new contacts at the Expo and spending time with our current clients and industry friends. We look forward to seeing you all again next year but in the meantime, we hope you will contact us to be your preferred provider for any and all of your cooling tower needs.

GEA Geothermal Energy Expo

Mark Austin & Allison Kenney at GEA Geothermal Energy Expo

Read More

ICS Completes Tower Demolition & Replacement 2-Days Early

Palinpinon Unit 1 completed on schedule
When EDC/FirstGen needed their Palinpinon Unit #1 cooling tower demolished and replaced in a tight 45 day outage they chose ICS as the turnkey contractor for this critical path project. ICS completed the project within 42 days, delivering a new ICS FRP cooling tower which has met or exceeded all expectations of EDC. Based upon our performance in this project, ICS was also awarded the further projects by EDC/FirstGen for the upgrade, repair and complete replacement of several of their existing cooling towers. Global solutions. Local results.
PROVEN GEOTHERMAL RESULTS
How can ICS help with your geothermal projects?
With hundreds of megawatts of geothermal cooling towers installed globally, Industrial Cooling Solutions Inc. (ICS) is your go-to partner for geothermal cooling. ICS has the proven experience and local personnel to support your most demanding requirements for new cooling towers, repair/upgrade of existing towers and spare parts for all makes of site built cooling towers.

Read More

ICS at GRC Conference and Show

October 23 – 26, 2011, ICS exhibited at the Geothermal Resources Council (GRC) show in San Diego, California. ICS is a member of GRC and very active in the global geothermal cooling business. The show was the best attended GRC show on record and ICS is proud to be an active member of GRC.
ICS at GRC Conference and Show            ICS at GRC Conference and Show

Read More