Cooling Tower Replacement

Reasons for A Cooling Tower Replacement

Like any other large piece of industrial equipment, the ravages of time eventually take their toll on a cooling tower’s capacity. At a certain point, routine maintenance and patchwork replacement of components is no longer enough to ensure that a cooling tower is capable of achieving the performance necessary to support its intended application.

In order to extend the life of a cooling tower and boost its cooling capacity, a reconstruction project may become necessary; this will ensure that your business is able to continue to function properly for the foreseeable future.

Benefits of Cooling Tower Replacement

In addition to enhancing a cooling tower’s intended capacity, reconstruction also presents the opportunity to upgrade a tower’s structural components. Cooling tower fill &motor replacement can easily be completed during these projects if the tower’s fill is clogged or damaged, allowing for higher-performing pieces to be implemented.

How to Proceed Once Your Cooling Tower Has Been Completed

Once your reconstruction project is done, it’s important that you discuss recommendations on a maintenance schedule and scope with your supplier in order to avoid any degradation of your updated cooling tower. A qualified manufacturer should be able to provide you with concrete advice specific to your situation, and may even be able to offer assistance with the servicing itself.

As a general rule, every cell of your tower should receive an inspection every year of components like gearboxes (plus gearbox oil and seals), driveshafts, distribution water basins, fan cylinders, fill, and distribution piping and nozzles among others.

Why Us?

Industrial Cooling Solutions is a global team of industry experts; we offer construction and service all over the world backed by years of knowledge and experience.

Project: Palinpinon Geothermal Power Plant

Industry: Geothermal

Location: Philippines

Client: EDC

Tower Type: Crossflow, FRP

Year: 2012-13

ICS was contracted for demolition and cooling tower replacement of  Unit #1 of Palinpinon Geothermal Power Plant owned by EDC Philippines. The project was set on a very tight schedule to demolish a dilapidated old 3-cell class 600 Marley wood tower and replace it with a new ICS FRP crossflow cooling tower in 42 days from start to finish. ICS was able to complete this complex job two days early

 

 

 

Read More

Empire Farms

Project: Empire Energy/Empire Farms Garlic Farm

Industry: Geothermal

Location: Nevada

Tower Type: 3-Cell, Counterflow, FRP

 


Contact Us

Read More

Cawayan BacMan 3

Project: Cawayan Crossflow to Counterflow Conversion Project

Industry: Geothermal Power

Location: Philippines

Tower: 2-Cell, Fiberglass FRP Splash Fill to Film Fill Conversion

Year: 2011

FRP Geothermal Cooling Tower Counterflow to Crossflow Conversion:
ICS was contracted by EDC to build a new FRP film fill counterflow cooling tower in the existing basin where a GEA wood crossflow had burned down. ICS was able to complete the project quickly and provide EDC with a fire retardant cooling tower which would not burn down like the wooden cooling tower. ICS’s FRP cooling tower also did not require a wetdown system or a fire protection system as 100% of the FRP and plastic materials supplied were rated at a 25 or less flame spread rating. Working in the jungle rain and heat, ICS was able to complete the tower in the existing basin on schedule and was commended by the owner for being the first to complete works on the site.

Geothermal cooling towers are specialized applications. ICS has global experience and expertise in geothermal cooling tower applications. Working with FRP, wood, concrete and concrete/FRP structures, ICS can custom design to your project specification. Low-fouling Film or splash fill, ICS works with you to determine the best fill selection for your project. ICS also consults with our cooling water treatment alliance partners to make certain the choice is right for the project.

Contact Us

Read More

BacMan 1 & 2

ICS performed complete “splash fill” to “film fill” conversions and total tower rehabilitation (structure, mechanical, decking) under a tight time schedule and with a perfect safety record for two counterflow, wood, six-cell towers.

Project: BacMan 3

Industry: Geothermal

Location: Philippines

Tower Type
: 6-Cell, Counterflow, Wood

Client: EDC

Year: 2011

Cooling Tower Rehabilitation with Splash to Film Fill Conversion:
ICS was hired to help EDC Philippines with a major upgrade of an old geothermal power station. Two 6-cell Hamon wooden structure splash fill cooling towers were in bad shape and in need of serious repair. EDC also wanted to maximize backpressure on the turbine. ICS offered and guaranteed substantial cooling tower performance upgrades which would help. ICS was selected to do an extensive rehabilitation and thermal upgrade of the towers on a very tight budget. ICS replaced more than 70% of the structure & mechanical equipment but reused what was possible to save cost. Splash fill was removed and a low-fouling film fill was installed. The reduced pumphead from the splash to film conversion saves EDC power consumption everyday. The added performance allowed EDC to greatly improve plant performance. ICS completed our works on schedule and was the first contractor to complete works in this very remote and difficult site.

Ask ICS how we can support your cooling tower rehabilitation projects splash to film fill conversions, structural upgrades, mechanical upgrades and overall thermal upgrades to your project.


Contact Us

Read More

Palinpinon 2

Project: Palinpinon 2

Industry: Geothermal

Location: Philippines

Tower Type: Crossflow, FRP

Client: EDC

Year: 2012-2013

 

Contact Us

Read More

EDC N2N Relocation Project

Project: EDC N2N Relocation Project

Industry: Geothermal

Location: Philippines

Tower Type: 6-Cell, Counterflow

Client: EDC

Year: 2011

When EDC needed to relocate an idle SPX/Marley cooling tower, ICS dismantled, moved, and rebuilt it for optimal performance in the new environment.

Contact Us

Read More

Patuha

Project: Patuha

Industry: Geothermal

Client: Toshiba

Location
: Indonesia

Tower Type: 6-Cell, Concrete Hybrid, Counterflow

Year: 2011

Contact Us

Read More

Mak Ban 6

Turnkey Upgrade and Rehabilitation of old SPX Marley Crossflow cooling tower

Project: Mak Ban 6

Tower Type: 6-Cell, Crossflow, Wood.

Location: Luzon, Philippines

Year: 2008

Major repair project of a dilapidated 6-cell crossflow wood cooling tower. Aboitiz Power hired ICS to help Aboitiz rehabilitate an an old SPX Marley crossflow tower to peak performance and make it reliable again. The project was made much more difficult by the advanced state of decay of the wood, necessitating ICS and our local partner to have stringent safety protocols to ensure a Zero incident project. Starting from the top, ICS replaced most of the fan and hot water decks and the joists deck joists, the fans were rebuilt, gearboxes and driveshafts as well. Fill was replaced as needed and rehung as practical as were the drift eliminators. – total turnkey engineering, supply and construction by ICS.

Have an old dilapidated tower or just an under performing cooling tower in need of specialized attention and care? ICS can help you analyze, pre-plan and budget your work and take the project from planning to successful completion. Contact ICS now to ask how we can help you upgrade your plant performance.